Loaram Constructions Loaram Constructions Loaram Constructions
Navigation
  • Our Projects
  • About Us
    • Markets, Services & Value
    • Compliance, Delivery & Conformance
  • Contact Us
  • Home

Fashion and Textiles Hub at Kangan Institute - Richmond

Kangan Institute Richmond
shadow

Client: Kangan Institute

Project: Building F – Fashion and Textiles Hub at Richmond Campus

Scope: Major redevelopment of existing masonry factory space.

Delivered: October 2011

Value: circa $1,750,000

Key Trades: Structural, Hydraulic, Electrical, Mechanical, AV, Data, Security and Finishing Trades

shadow

Kangan Building F is one of the more challenging projects undertaken by Loaram. Our task was to transition a 1950s masonry factory of around 700m2 with added mezzanine into a fashion technology hub.

The immediate challenges included Category A soil contamination from tanneries of the past, high levels of ground water, horrid soil quality and an existing slab that was 200mm out of level across its length.

Loaram tendered the process and was then invited to participate in a value management process to bring the works within the available budget. This was successfully achieved.

The building was gutted and major structural and civil works undertaken including managing the contaminated soil issues.

This task swelled to greater significance when redundant oil tanks of 10,000L were discovered underground. In all, 6 weeks of remedial work was needed to redress the situation – without impacting on program. Much of the existing structural steel had to be isolated and refinished, masonry walls repaired and existing open steel stairways sensitively brought up to BCA requirements.

A fully interfaced mechanical system with automated louvres and awning windows, steam generation system, compressed air system and extensive electrical capacity are all unique features of the refit in line with the fashion hub use. A key plank of this use is a custom elevated access floor system in the open plan area procured and fitted via TASMAN Floors.

The prominent external feature is a complex external steel canopy lined with Alucobond and carrying a fully suspended CFC sheet soffit.

High levels of Audio Visual capability were included, as was the latest upgrade of the Kangan Access Control and CCTV systems.

Project Reference:
Philip Dixon – Kangan Manager Facilities & Capital Development – 03 9279 2349.

  • Kangan Institute Richmond
  • Kangan Institute Richmond
  • Kangan Institute Richmond
  • Kangan Institute Richmond
shadow

Project Case Studies

Craigieburn Sporting Club Complex Upgrade and Extension

JK Grant Reserve Redevelopment

Hanmer Reserve Pavilion Extension - Yarraville

South Kingsville Medical Centre

Maidstone Tennis Pavilion

BC Building at Deakin University - Burwood

Technical Workshop at Deakin University - Waterfront

Fashion and Textiles Hub at Kangan Institute - Richmond

Canopy and Walkway, Station Pier

GTP Café at Deakin University - Waurn Ponds

The Circle Pharmacy - Altona

City Football Club at Latrobe University - Bundoora

Research Laboratory at Deakin University - Waurn Ponds

Port of Melbourne Control Shipping Tower

Simonds College Refurbishment - West Melbourne

South Kingsville Medical Centre Upgrade

Electrical Engineering Laboratory at Deakin University - Waurn Ponds

State Emergency Services - South West Regional HQ Refit

Phone: 03 9399 8211 | [email protected] | PO Box 3182, Newport. Victoria 3015 Australia

© 2020 Loaram Constructions Pty Ltd | Another awesome website by Red&Crew